204  三峡移民工程房屋建筑情况2007
Building Construction of
Three Gorges Resettlement Project (2007)
单位:万平方米           (10 000 sq.m)
        Item 设计总面积 累计竣工
建筑面积
本年计划
竣工面积
本年竣工
面  积
本年竣工
房屋价值
(万元)
Total
Designed
Area
Total Space Floor Completed Space Floor Planned to Complete in This Year Space Floor  Complete in This Year Value of Completed Buildings in This Year
(10 000 yuan)
合 计 Total 2640.43 3909.46 113.73 155.08 52112.30
厂房 Factory Buildings 320.82 382.84
住宅 Residential Buildings 1776.39 2954.96 113.68 154.44 51459.72
农村住房     Rural Areas 491.36 1031.94 56.95 75.13 14515.41
城(集)镇住房     Urban Areas 1102.58 1598.85 56.73 79.01 36809.31
工矿企业住房     Industrial and Mining Enterprises 182.45 324.17 0.30 135.00
办公用房 Offices 256.74 291.08 0.02 0.61 640.60
商业、居民
 服务业用房
Buildings for Commerce and
  Residential Services
140.55 142.37
文化教育用房 Buildings for  Culture  and Education 83.36 70.71
医疗用房 Buildings for Medical Cares 30.14 29.01
科研用房 Buildings for Research 0.41 0.40
其他用房 Buildings for Other Purposes 32.02 38.09 0.03 0.03 11.98